#datacenter

2 posts2 participants1 post today

I am job hunting if anyone is looking for an #IT #engineer

I currently work in Mergers and Acquisitions as an IT specialist in the embroidery field, but I have experience with #Cisco #networking including their Firepower ASA and their switches. I am also an #MDM engineer and I am the team lead for SOP writing and development. #SSO experience with Okta. Admin experience with #Threatlocker.

I have operated in a variety of compliance frameworks including #CMMC #PCI and #FEDRAMP for the last 2 years. I've spent 3 years working medical field so I'm #HIPAA aware as well.

I would like to get back into a #datacenter job. I am comfortable with #travel and I'm comfortable with #parttime and #contract work if you have any recommendations.

I won't do defence companies though.

'xAI is buying an overseas power plant and shipping the whole thing to the US (tariff please?) to power its new data center— 1 million #AI GPUs and up to 2 Gigawatts of power, equivalent to powering 1.9 million homes.

It's no secret that #musk has already run into power troubles. Colossus, xAI's main #dataCenter, has 35 gas turbines that can produce 420 MW of power. However, things are going to get much more serious going forward.'

Yeah- up to 5 times more #gas. 🤬
tomshardware.com/tech-industry

Tom's Hardware · Elon Musk confirms xAI is buying an overseas power plant and shipping the whole thing to the U.S. to power its new data center — 1 million AI GPUs and up to 2 Gigawatts of power under one roof, equivalent to powering 1.9 million homesBy Anton Shilov

Plan would power new #Microsoft #AI #DataCenter with electricity from Pa.'s #ThreeMileIsland #nuclear reactor

Constellation Energy is prepared to invest $1.6 billion to bring the plant's surviving reactor from the 1979 meltdown back online.

By Michael Tanenbaum, PhillyVoice Staff
September 20, 2024

Excerpt: "Tech companies favor nuclear power for AI

"In the race to develop artificial intelligence applications, tech companies are scrambling to build data centers, which require enormous amounts of electricity to operate. Such facilities are forecast to make up a growing share of the nation's electricity use in the years to come, prompting companies to look at tapping into existing infrastructure to help meet their needs.

"#NuclearPower is being touted as a cost-effective solution for these data centers that also limits reliance on carbon-producing power sources. Building and directly connecting data centers to nuclear plants is known as co-location, a strategy that industry leaders favor because it's cheaper and faster to do. Proponents also claim it reduces stress on the transmission grids.

[...]

"When Constellation signaled interest in restarting Three Mile Island in July [2024], doubts surfaced about the technical feasibility of the project. Not only would it be the first of its kind, but it will have to be accomplished next to another reactor whose clean-up and decommissioning is expected to continue through 2078.

"The site also remains politically contentious due to the lasting memory of the 1979 accident, which displaced surrounding communities and left a legacy of fear over whether the #radiation released contributed to increased #cancer rates in the vicinity. About 2 million people were exposed to #RadioactiveFallout as a result of the meltdown.

"Public health researchers from Temple, Penn State and the University of Pittsburgh published a report last year finding that long-term studies into the impact of the meltdown were limited by research flaws."

Read more:
phillyvoice.com/ai-three-mile-

#WaterIsLife #NuclearPowerPlants
#NoNukes #NoNukesForAI #BigTech #NuclearWaste #RethinkNotRestart #NuclearIsNotCarbonFree #Pennsylvania #CancerRates

PhillyVoice · Plan would power new Microsoft AI data center with electricity from Pa.'s Three Mile Island nuclear reactorConstellation Energy is prepared to invest $1.6 billion to bring the plant's surviving reactor from the 1979 meltdown back online.

On 1,200 acres of cornfield in Indiana, Amazon is building one of the largest computers ever

"A year ago, a 1,200-acre stretch of farmland outside New Carlisle, Ind., was an empty cornfield. Now, seven Amazon data centers rise up from the rich soil, each larger than a football stadium.

Over the next several years, Amazon plans to build around 30 data centers at the site, packed with hundreds of thousands of specialized computer chips."

nytimes.com/2025/06/24/technol

The New York Times · At Amazon’s Biggest Data Center, Everything Is Supersized for A.I.By Karen Weise
Replied in thread

@gerrymcgovern

#AI #ClimateCrisis

*The Detrimental Effects of Data Centers' Rising #WaterConsumption*

(6/n)

...The devastating effects that occur, when #Multinationals such as #Nestlé or #Danone monopolize the #FreshWater supply, can be seen in many locations. 6)

👉In my view, #DataCenter operators need to be obliged not only to purchase #CarbonOffsetCredits.
A similar program needs to be developed for the #Conservation of the world's dwindling #FreshWater resources,👈
As a starting...

Holly Ridge is a rural community in Louisiana, home to rice and grain mills, an elementary school, a few houses and — soon — Meta's 4 million square foot AI data center. The facility will host thousands of servers that require billions of watts, and it will be partially funded by Louisiana residents, thanks to a deal with Entergy, the region's energy monopoly. @404mediaco has more details.

flip.it/08ntKN

404 Media · 'A Black Hole of Energy Use': Meta's Massive AI Data Center Is Stressing Out a Louisiana CommunityDetails about how Meta's nearly Manhattan-sized data center will impact consumers' power bills are still secret.

#NVIDIA #TensorCore Evolution: From Volta To Blackwell Amdahls Law, Strong Scaling, Asynchronous Execution, Blackwell, Hopper, Ampere, Turing, Volta, TMA
They introduce core features of major #datacenter #GPU, first explaining important first principles of performance engineering. Then trace evolution of Nvidia’s Tensor Core architectures and programming model, highlighting motivations behind evolution. End goal is to provide a resource for understanding Nvidia’s GPU arch
semianalysis.com/2025/06/23/nv

SemiAnalysis · NVIDIA Tensor Core Evolution: From Volta To BlackwellIn our AI Scaling Laws article from late last year, we discussed how multiple stacks of AI scaling laws have continued to drive the AI industry forward, enabling greater than Moore’s Law grow…

#UK company allegedly paid $4m in #bribes to secure #Microsoft #datacenter construction contract
Three people were arrested by the UK Serious #Fraud Office (SFO) after #Blu3, a construction management company, was suspected of bribing former members of the #MaceGroup during construction of a Microsoft data center in the #Netherlands.
tomshardware.com/tech-industry

Tom's Hardware · UK company allegedly paid $4m in bribes to secure Microsoft data center construction contractBy Jowi Morales