shakedown.social is one of the many independent Mastodon servers you can use to participate in the fediverse.
A community for live music fans with roots in the jam scene. Shakedown Social is run by a team of volunteers (led by @clifff and @sethadam1) and funded by donations.

Administered by:

Server stats:

292
active users

#sendai

0 posts0 participants0 posts today

Since the 2011 #Fukushima accident, Japan has restarted 14 #NuclearReactors

1/10/2025

"Japanese utilities restarted two additional nuclear reactors in 2024 that had been suspended from operations in response to the 2011 #FukushimaDaiichi accident, taking the total number of restarted reactors to 14 since the accident.

"In November, #TohokuElectricPowerCo. restarted its 796-megawatt (MW) #Onagawa Unit 2 reactor, and in December #ChugokuElectricPowerCo. restarted its #Shimane Unit 2 (789 MW). Onagawa is the nuclear power plant located closest to the epicenter of the March 2011 #earthquake and tsunami.

"Most of the restarted reactors have been pressurized water reactors (PWR) located in western Japan. Onagawa Unit 2 and Shimane Unit 2, by contrast, are the first boiling water reactors (BWR) to be restarted. Onagawa Unit 2 is also the first reactor in the eastern part of the country to be restarted. Japan’s nuclear regulator prioritized the restart of PWRs due to public safety concerns regarding BWR technology, which is the design of the Fukushima Daiichi units.

"Japan suspended its nuclear fleet from 2013 to 2015 for mandatory safety checks and upgrades following the 2011 Fukushima Daiichi accident. Before the accident, 54 commercial nuclear reactors were operating in Japan, and nuclear power accounted for approximately 30% of the country’s electricity generation. Nuclear restarts have proceeded slowly since the first two units (#Sendai Units 1 and 2) were restarted in 2015. Restarts have been slow due to a significantly more stringent safety inspection and authorization process established after the accident and local court injunctions emerging from ongoing public safety concerns in some regions. Public support for restarts has been growing in Japan recently, however.

"Under the current restart process, once regulatory approvals have been granted, the local municipality and prefectural governments are consulted prior to restart. In addition to the 14 reactors already restarted, three more units (namely, the #KashiwazakiKariwa Unit 6 and Unit 7 and the #TokaiDaini unit) have received regulatory approval to restart but have yet to do so. Tohoku Electric Power announced in 2018 that Onagawa Unit 1 would be decommissioned rather than upgraded, but the utility plans to seek approval to restart Onagawa Unit 3. Restarting another 10 units is under regulatory review.

"The suspension of Japan's nuclear fleet after the Fukushima accident significantly increased dependence on natural gas, oil, and coal imports to make up for lost domestic nuclear generation. It also significantly increased the installed capacity of solar photovoltaic generation in the country, according to data from Japan’s Ministry of Economy, Trade and Industry. Japan has limited domestic fossil fuel resources and imports virtually all the fossil fuels it uses. Consequently, Japan is the world's second-largest importer of liquefied natural gas (LNG) after China and the third-largest importer of coal.

"As part of Japan’s sixth long-term energy plan, last updated in October 2021, the central government called for the nuclear share of the country’s electricity generation to reach 20%–22% by 2030. Nuclear power accounted for about 6% of Japan’s electricity generation in 2023. A draft of Japan’s seventh long-term energy plan was released on December 17, 2024, and says nuclear power should account for 20% of Japan’s energy supply in 2040.

"Japan’s current policy intends to maximize the use of existing reactors by restarting as many units as possible and extending the #LicensedOperatingLife beyond the current 60-year limit."

Source:
gasprocessingnews.com/news/202
#NoNukesForAI #RenewablesNow #RethinkNotRestart #NoMoreFukushimas #TEPCOLies #KEPCOLies #NoNukes #NuclearPlants #NuclearPowerCorruptionAndLies

gasprocessingnews.comSince the 2011 Fukushima accident, Japan has restarted 14 nuclear reactorsJapanese utilities restarted two additional nuclear reactors in 2024 that had been suspended from operations in response to the 2011 Fukushima Daiichi accident, taking the total number of restarted reactors to 14 since the accident.

Content warning:

I visited Miyagi and Fukushima prefectures a few weeks ago. At Sendai Airport in Miyagi, I went up to the observation deck, and remembered watching people up there as the tsunami came ashore, live on NHK on 3/11. I spliced some of that original footage into a video note I made.

#Lahaina, used to be a wetland, as @emorwee reports in Heated. Is your community, or your home, built on a wetland? It's more common than you might think. Much more about it in my book "Water Always Wins."
Disaster is an opportunity to build back differently, per the #Sendai Principles. Native Hawaiian Kaniela Ing is calling for "public lands, stewardship & water rights -- returning control of our public trust resources to the public." heated.world/p/lahaina-used-to

HEATEDLahaina used to be a wetlandBy Emily Atkin