Demo Ticker Berlin<p>💥Announcement! Tuesday 22.04.2025💥</p><p>🔥A100 – Highway to Hell oder Stairway to Heaven🔥</p><p>Tuesday 22.04.2025 | 07:00 pm | B-Lage Mareschstraße 1, 12055 Berlin</p><p>Arrival: S9, S41, S42, S45 Sonnenallee | Bus 171, M41 Mareschstraße</p><p>📣 Call: <a href="https://asanb.noblogs.org/?p=11161" rel="nofollow noopener noreferrer" translate="no" target="_blank"><span class="invisible">https://</span><span class="">asanb.noblogs.org/?p=11161</span><span class="invisible"></span></a> - @il_berlin</p><p><a href="https://todon.eu/tags/b2204" class="mention hashtag" rel="nofollow noopener noreferrer" target="_blank">#<span>b2204</span></a> <a href="https://todon.eu/tags/A100Stoppen" class="mention hashtag" rel="nofollow noopener noreferrer" target="_blank">#<span>A100Stoppen</span></a>!</p><p>🚩 Jour Fixe of the IL Berlin</p><p>The 16th construction phase of the A100 motorway is due to open at Treptower Park in summer 2025. This will mean 10,000 more cars rolling through our neighbourhoods every day.</p><p>At the same time, planning for the 17th construction phase is to be finalised this year.</p><p>And all for an absurd price: the A100 is now costing 1.8 billion euros. That's 250,000 euros for just a single metre of road!</p><p>At the same time, the CDU and Wegner want to save 3 billion euros this year alone, especially in the areas of health, education, social affairs, climate protection and housing.</p><p>We will not allow the CDU to build a highway to hell through our city and destroy our city with cuts.</p><p>We stand for a Berlin based on solidarity, caring and worth living in!</p><p>Afterwards, interested parties will have the opportunity to get to know IL Berlin better.</p>